Project Title
Widdershin Track Construction
Client
Nelson City Council
Location
Dun Mountain Trail, Brook Valley, Nelson
Services
Trail Redevelopment
Project Budget
$42,000
Year
2014
Key to this project was the creation of a Grade 3 standard track to connect the much loved Involution and Barnicoat Trails. No design or alignment was specified for this track, just a budget, a start and an end point. The rest was left to the skill and expertise of our in-house design and implementation team.
This project required us to:
- Identify the best possible line to meet the required gradient
- Cut the initial track line by removing existing vegetation
- Use of a 1.5 tonne digger to form the track
- Use existing onsite materials for track surfacing
- Install suitable drainage methods to deal with the high rainfall that the area can experience